Todd Engineering delivered a comprehensive turnkey installation for Gemini Taunton, a long-standing customer. A temporary booth was installed to maintain full operational continuity while the new Zeus all-electric system was commissioned — demonstrating Todd Engineering's commitment to zero-downtime delivery.
Installed Equipment
Zeus All-Electric Spray Booth — Far infrared curing technology, side-loading roller shutter door and all-electric operation aligned with carbon-neutral goals.
Track & Skate System — Seamless vehicle movement from preparation through to the refinishing stage, significantly improving workflow.
Dedicated Paint Mixing Room — Positioned adjacent to the spray booth for optimal efficiency and reduced turnaround.
Temporary Olympian Booth — Installed during transition to maintain zero operational downtime throughout the project.
"Everything went and was fine yesterday, thank you. I would like to commend every one of you involved in the installation. From your good self to the guys who have been working so hard to complete the install. Please pass on my thanks!"
— Stuart, General Manager — Gemini Taunton