MG Accident Repair Centre, a long-standing Todd Engineering customer, upgraded from their existing Spartan booth to the Zeus all-electric system — driven by carbon-neutral goals, PAS 2060 compliance ambitions and the desire to reclaim space previously occupied by a gas bulk tank. The results exceeded expectations across every metric.
Installed Equipment
Zeus All-Electric Spray Booth — Installed adjacent to existing Spartan booth following successful operational trials. Superior performance, energy efficiency and environmental credentials.
Elimination of Gas Infrastructure — Removal of the gas bulk tank reclaiming significant floor space and removing ongoing fuel supply costs.
PAS 2060 Compliance Support — All-electric operation directly supporting MG's carbon-neutral certification journey.
Reduced Drying Times — Far infrared technology delivering faster cycle times and increased throughput capacity.
Higher Production Capacity — 50% increase in productivity reported following the transition to the Zeus system.